التفاصيل البيبلوغرافية
العنوان: |
[Productivity indicators in a sterilization central supply]. |
عنوان ترانسليتريتد: |
Parâmetros de produtividade de um centro de material e esterilização. |
المؤلفون: |
Sancinetti TR; Divisão de Enfermagem de Pacientes Externos do Departamento de Enfermagem do Hospital Universitário da USP. trsanci@yahoo.com.br, Gatto MA |
المصدر: |
Revista da Escola de Enfermagem da U S P [Rev Esc Enferm USP] 2007 Jun; Vol. 41 (2), pp. 264-70. |
نوع المنشور: |
English Abstract; Journal Article |
اللغة: |
Portuguese |
بيانات الدورية: |
Publisher: Universidade de São Paulo, Escola de Enfermagem Country of Publication: Brazil NLM ID: 0242726 Publication Model: Print Cited Medium: Print ISSN: 0080-6234 (Print) Linking ISSN: 00806234 NLM ISO Abbreviation: Rev Esc Enferm USP |
أسماء مطبوعة: |
Original Publication: São Paulo, SP: Universidade de São Paulo, Escola de Enfermagem |
مواضيع طبية MeSH: |
Efficiency*, Materials Management, Hospital/*statistics & numerical data , Sterilization/*statistics & numerical data, Time Factors |
مستخلص: |
This study identifies productivity indicators at a Sterilization Central Supply (CME) through documents, observation and time counting of the process for two items selected from the sample: a bandage pack and a herniorrhaphy box. The monthly average production was 30,466.42 items, and the production capacity per hour was 10.3 items per employee. The bandage pack averaged 295 minutes from the expurgation area to storage; the manual process lasted 46 minutes and the automated 88 minutes. For the herniorrhaphy box the average was 329 minutes; the manual process lasted 60 minutes and automated 98 minutes. In the bandage kit, the manual process used up 59.23% of the productivity hours in the expurgation area, 3.28% in the preparation, 10.94% in the sterilization process, and 26.31% in storage and distribution. Figures for the manual process of herniorrhaphy box were: expurgation, 11.84%; preparation, 16.20%; storage and distribution, 7.47%; and sterilization, 1.89%. The study made possible to assess the results and to analyze the working process at the CME. |
تواريخ الأحداث: |
Date Created: 20070829 Date Completed: 20071227 Latest Revision: 20190911 |
رمز التحديث: |
20240628 |
DOI: |
10.1590/s0080-62342007000200013 |
PMID: |
17722393 |
قاعدة البيانات: |
MEDLINE |