دورية أكاديمية

Extending Their Lifetimes : Keeping HVdc and FACTS Installations in Service Longer.

التفاصيل البيبلوغرافية
العنوان: Extending Their Lifetimes : Keeping HVdc and FACTS Installations in Service Longer.
المؤلفون: Kirby, Neil M., Marken, Paul E., Paradis, Michael, Wang, Pei, Plowright, Ian, Moon, Hyung-Bae, Ingemansson, Dag, Mendis, Reginald, Mehraban, Ben
المصدر: IEEE Power & Energy Magazine; Mar2016, Vol. 14 Issue 2, p57-65, 9p
مستخلص: High-Voltage (HV) DC transmission and flexible ac transmission systems (FACTSs) have been in operation for over 50 years, and in many cases these installations have become an indispensable part of many power networks around the world. With a design life of typically 30 years, some of the original installations have already been, or are presently being, partially refurbished or replaced, while others are in the planning stages for some method of life extension. The strategy adopted for extending the life of an HVdc system depends on many factors, both commercial and technical, and ranges from refurbishment through the replacement of a few components, to replacement of the complete link. Individual installations have their own specific issues, such as increasing levels of maintenance, obsolescence of particular components, or increasing failure and outage rates, which all lead to a real or perceived risk to availability in the near future. [ABSTRACT FROM PUBLISHER]
Copyright of IEEE Power & Energy Magazine is the property of IEEE and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
قاعدة البيانات: Complementary Index
الوصف
تدمد:15407977
DOI:10.1109/MPE.2015.2501222