دورية أكاديمية

CURRENT SURVEYING METHODS FOR THE INTEGRATION OF ADDITIVE MANUFACTURING IN THE CONSTRUCTION PROCESS.

التفاصيل البيبلوغرافية
العنوان: CURRENT SURVEYING METHODS FOR THE INTEGRATION OF ADDITIVE MANUFACTURING IN THE CONSTRUCTION PROCESS.
المؤلفون: Maboudi, M., Gerke, M., Hack, N., Brohmann, L., Schwerdtner, P., Placzek, G.
المصدر: International Archives of the Photogrammetry, Remote Sensing & Spatial Information Sciences; 8/24/2020, Vol. 43 Issue B4, p763-768, 6p
مصطلحات موضوعية: MANUFACTURING processes, RAPID prototyping, CALL centers, BUILDING inspection
الشركة/الكيان: DEUTSCHE Forschungsgemeinschaft, TECHNISCHE Universitat Munchen
مستخلص: The Technical University of Braunschweig (Brunswick) and Technical University of Munich were successful to establish a Collaborative Research Centre called "Additive Manufacturing in Construction (AMC) – The Challenge of Large Scale" starting from 2020 and funded by the German Research Foundation (DFG). The aim of this project is "to create the basic conditions for the introduction of additive manufacturing in construction, and thus to pave the way for the use of resource-efficient constructions with a high level of design freedom". Surveying engineering (geodetic surveying, photogrammetry, laser scanning and GNSS) plays a major role in one of the sub-projects called "Integration of Additive Manufacturing in the Construction Process". This paper aims at introducing the large scale AMC with the main focus on investigating the role of surveying engineering in this topic which will be a topic of high interest in the coming years in the digital fabrication within construction field. After a short introduction on additive manufacturing in construction, this paper will present the general aims and structure of the Collaborative Research Centre. Thereupon, the importance of geometric quality inspection and establishing and transferring different coordinate systems during the Additive Manufacturing (AM) construction steps (elements fabrication, installation and whole structure/building control) and the role of geodetic surveying, photogrammetry, laser scanning and GNSS will be outlined. This will be presented within a subproject called "C06: Integration of Additive Manufacturing in the Construction Process" and potentials and challenges for integrating surveying engineering in component and building level additive manufacturing in construction are mentioned. [ABSTRACT FROM AUTHOR]
Copyright of International Archives of the Photogrammetry, Remote Sensing & Spatial Information Sciences is the property of Copernicus Gesellschaft mbH and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
قاعدة البيانات: Complementary Index
الوصف
تدمد:16821750
DOI:10.5194/isprs-archives-XLIII-B4-2020-763-2020