دورية أكاديمية

Reconfigurable layout problem.

التفاصيل البيبلوغرافية
العنوان: Reconfigurable layout problem.
المؤلفون: Meng, G., Heragu *, S. S., Zijm, H.
المصدر: International Journal of Production Research; 11/15/2004, Vol. 42 Issue 22, p4709-4729, 21p, 6 Charts
مصطلحات موضوعية: PRODUCTION management (Manufacturing), INDUSTRIAL engineering, ASSEMBLY line methods, PLANT layout
مستخلص: This paper addresses the reconfigurable layout problem, which differs from traditional, robust and dynamic layout problems mainly in two aspects: first, it assumes that production data are available only for the current and upcoming production period. Second, it considers queuing performance measures such as work in progress inventory and product lead time in the objective function of the layout problem. A process to solve the reconfigurable layout problem is proposed. A previously developed, open queuing network-based analytical model, called Manufacturing System Performance Analyser, is used to estimate the stochastic performance measures of a layout. These are combined with deterministic performance measures such as material handling cost to determine the layout for the new period. A case study is used to illustrate the process of solving the reconfigurable layout problem. [ABSTRACT FROM AUTHOR]
Copyright of International Journal of Production Research is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
قاعدة البيانات: Complementary Index
الوصف
تدمد:00207543
DOI:10.1080/0020754042000264590