دورية أكاديمية

A comparison of mean reduction versus variance reduction in processing times in flow shops.

التفاصيل البيبلوغرافية
العنوان: A comparison of mean reduction versus variance reduction in processing times in flow shops.
المؤلفون: Taylor, G. D., Heragu, S. S.
المصدر: International Journal of Production Research; 6/15/1999, Vol. 37 Issue 9, p1919, 16p
مصطلحات موضوعية: PRODUCTION scheduling, PRODUCTION control
مستخلص: A constant industry challenge is to find ways to improve production capabilities within the boundaries established by constrained resources. There are several types of production improvement that represent laudable management goals, and there are many ways to achieve production improvement goals. In this paper, we focus on two production metrics and two means of improvement. Specifically, we are concerned with finding ways to decrease manufacturing work in process levels and cycle times in flow shops. A common method of improvement is through mean processing time reduction that is frequently brought about by technological improvements in processing equipment. Another common means of improvement that is receiving increasing attention in the literature is variance reduction. Herein, we quantify and compare the levels of improvement brought about by reduction in both mean and variance of processing times. [ABSTRACT FROM AUTHOR]
Copyright of International Journal of Production Research is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
قاعدة البيانات: Complementary Index
الوصف
تدمد:00207543
DOI:10.1080/002075499190833