FRIB, which is a new heavy ion accelerator facility to provide intense beams of rare isotopes is currently under construction at Michigan State University. Its driver linac accelerates all stable ions up to uranium, and targets to provides a CW beam with the energy of 200MeV/u and the beam power of 400 kW. The beam commissioning of the driver linac has been planned to start from December 2017. A new infrastructure is under development using service oriented architecture for physics applications, which is a 3-tier structure consisting of upper level, middle layer, and low level respectively. The detailed design and its current status will be presented in this paper. Proceedings of the 15th Int. Conf. on Accelerator and Large Experimental Physics Control Systems, ICALEPCS2015, Melbourne, Australia