Magnet system for the KEKB main ring

التفاصيل البيبلوغرافية
العنوان: Magnet system for the KEKB main ring
المؤلفون: T. Kubo, Norihito Ohuchi, Mika Masuzawa, K. Endo, Kiyosumi Tsuchiya, Ryuhei Sugahara, Yasunobu Ohsawa, Masato Yoshida, Kazumi Egawa, Hitoshi Fukuma, Toshiyuki Ozaki
المصدر: Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment. 499:24-44
بيانات النشر: Elsevier BV, 2003.
سنة النشر: 2003
مصطلحات موضوعية: Physics, Nuclear and High Energy Physics, Magnetic flux, Magnetic field, B-factory, Nuclear physics, Dipole, KEKB, Magnet, Quadrupole, Physics::Accelerator Physics, High Energy Physics::Experiment, Quadrupole magnet, Instrumentation
الوصف: KEKB is a two-ring electron–positron collider with asymmetric energies of 8 and 3.5 GeV to study CP violation in B meson decay. In KEKB, there are 21 types of magnets; about 1600 in total. About 430 dipole and quadrupole magnets were recycled from TRISTAN, the preceding program. All quadrupole magnets are equipped with vertical and horizontal steering dipole magnets. The number of steering magnets is about 1700. There are 212 sextupole magnets, and all of them are fixed on remotely controlled movers to adjust their positions to the beam passage. All main dipole magnets have back-leg coils to steer beams precisely. All quadrupole and sextupole magnets are equipped with correction coils to have a capability for beam-based alignment. Also one-turn coils are installed as well to each magnetic pole of the main magnets to monitor the magnetic flux in the case of trouble. The magnetic field in all magnets was measured and its quality strictly checked. After field measurement, the magnets were installed and precisely aligned. A cooling water system and a power supply system for these magnets were constructed. Magnet design was started in 1994, and construction of the two rings was completed in November 1998. The parameters of the magnets and the construction of the KEKB magnet system are described. Some of the problems experienced during this construction work are also presented.
تدمد: 0168-9002
URL الوصول: https://explore.openaire.eu/search/publication?articleId=doi_________::aa2646f4e3b94c3eb5a685cd2ce78e32
https://doi.org/10.1016/s0168-9002(02)01772-2
حقوق: CLOSED
رقم الأكسشن: edsair.doi...........aa2646f4e3b94c3eb5a685cd2ce78e32
قاعدة البيانات: OpenAIRE