Model Test Study on a Large-Section Cable Tunnel

التفاصيل البيبلوغرافية
العنوان: Model Test Study on a Large-Section Cable Tunnel
المؤلفون: Hai Hong Mo, Ying Guang Fang, Shu Zhuo Liu, Ren Guo Gu, Jun Sheng Chen
المصدر: Applied Mechanics and Materials. :1411-1416
بيانات النشر: Trans Tech Publications, Ltd., 2013.
سنة النشر: 2013
مصطلحات موضوعية: Coupling, Engineering, business.industry, Shield, Framing (construction), Pillar, Full scale, Model test, General Medicine, Structural engineering, business, Internal stress
الوصف: The profile layout rationality and internal stress structure of a large-section cable tunnel and a cable-laying scheme at splicing locations were studied through full-scale model test. The full scale shield tunnel which the diameter was 6m was built on the ground. The model tests test the displacement of cable bearers, the coupling area between horizontal beam and steel ring, the coupling area between horizontal beam and steel pillar, edge beam and center beam under design loads, and the safety and reliability of an arc steel framing system that supports the cable load inside the cable tunnel during the operation stage were demonstrated. The cable-laying schemes for the cross section and straight-through-type and T-type couplings of a large-section cable tunnel were optimized through experiment on actually laid-out cables. For the section layout of a large-section cable tunnel, it is believed that the double-deck scheme prevails over the single-deck scheme, and such a cable-splicing scheme can meet the cable-laying requirement.
تدمد: 1662-7482
URL الوصول: https://explore.openaire.eu/search/publication?articleId=doi_________::b6bd7f593bdc7c67c119eee9d3a2611f
https://doi.org/10.4028/www.scientific.net/amm.353-356.1411
حقوق: CLOSED
رقم الأكسشن: edsair.doi...........b6bd7f593bdc7c67c119eee9d3a2611f
قاعدة البيانات: OpenAIRE