Schedule delay analysis of a multi-storied residential project using primavera

التفاصيل البيبلوغرافية
العنوان: Schedule delay analysis of a multi-storied residential project using primavera
المؤلفون: Kandlagunta Mounika, K Anand Goud, Akula Prakash, Balakrishna Ch
المصدر: IOP Conference Series: Materials Science and Engineering. 1091:012038
بيانات النشر: IOP Publishing, 2021.
سنة النشر: 2021
مصطلحات موضوعية: Schedule, Operations research, Computer science, Delay analysis
الوصف: Procrastination in schedule is a major problem for any construction project. Completing the project on time is a very hard task as the delay in construction occurs due to various factors. Loss of time and money are the outcomes of the delay in the project. The delay may occur through various factors, which are mostly unpredictable. These delays cause losses to the contractor; sometimes this may also lead to discontinuation of the contract and affect the possession date of the project. It is necessary to determine the factors that are responsible for the delay. In this study, schedule delay analysis is conducted on the construction of a multi-storied residential project and the factors and parties responsible for the delays are found out. Many unforeseen factors and ignored issues that lead to the delay are identified. Using various features and tools of Primavera software, the schedule delay analysis is conducted, and an alternate schedule is created with increased resources and time so that it reduces the effect of delays, which would be worthwhile to the contractor and all other parties involved in the project.
تدمد: 1757-899X
1757-8981
URL الوصول: https://explore.openaire.eu/search/publication?articleId=doi_________::d02c45ccfdc7c21da9b372b869ab6d5b
https://doi.org/10.1088/1757-899x/1091/1/012038
حقوق: OPEN
رقم الأكسشن: edsair.doi...........d02c45ccfdc7c21da9b372b869ab6d5b
قاعدة البيانات: OpenAIRE