The MUSE project face to face with reality

التفاصيل البيبلوغرافية
العنوان: The MUSE project face to face with reality
المؤلفون: Roland Reiss, Peter M. Weilbacher, Antonio Manescau, J.-L. Lizon, Remko Stuik, Lluís Brotons, H. Anwand, L. Capoani, Christian Monstein, Christophe Dupuy, M. Loupias, Joel Vernet, L. Adjali, H. Valentin, M. Le Floc'h, F. Laurent, Marc François, T. Hahn, E. Daguisé, Laure Piqueras, J. E. Migniau, Andreas Kelz, Matteo Accardo, P. Caillier, Roland Bacon, Harald Nicklas, D. Boudon, G. Hansali, L. Parès, Aurélien Jarno, Ole Streicher, A. Remillieux, E. Renault, Gerard Zins, C. Koehler, M. Dupieux, Johan Kosmalski, Andreas Glindemann, D. Gojak, Gero Rupprecht, Arlette Pécontal-Rousset
المصدر: SPIE-The International Society for Optical Engineering
بيانات النشر: SPIE, 2012.
سنة النشر: 2012
مصطلحات موضوعية: Point (typography), Computer science, business.industry, Face (sociological concept), 02 engineering and technology, Plan (drawing), 021001 nanoscience & nanotechnology, 7. Clean energy, 01 natural sciences, Test (assessment), 010309 optics, Face-to-face, Engineering management, Procurement, 0103 physical sciences, Project management, 0210 nano-technology, business, Simulation
الوصف: MUSE (Multi Unit Spectroscopic Explorer) is a second generation instrument built for ESO (European Southern Observatory) to be installed in Chile on the VLT (Very Large Telescope). The MUSE project is supported by a European consortium of 7 institutes. After the critical turning point of shifting from the design to the manufacturing phase, the MUSE project has now completed the realization of its different sub-systems and should finalize its global integration and test in Europe. To arrive to this point many challenges had to be overcome, many technical difficulties, non compliances or procurements delays which seemed at the time overwhelming. Now is the time to face the results of our organization, of our strategy, of our choices. Now is the time to face the reality of the MUSE instrument. During the design phase a plan was provided by the project management in order to achieve the realization of the MUSE instrument in specification, time and cost. This critical moment in the project life when the instrument takes shape and reality is the opportunity to look not only at the outcome but also to see how well we followed the original plan, what had to be changed or adapted and what should have been.
تدمد: 0277-786X
URL الوصول: https://explore.openaire.eu/search/publication?articleId=doi_dedup___::0dee83a4e5846e9bc037dff5443900cd
https://doi.org/10.1117/12.925968
حقوق: CLOSED
رقم الأكسشن: edsair.doi.dedup.....0dee83a4e5846e9bc037dff5443900cd
قاعدة البيانات: OpenAIRE