Progress in ITER ECE Diagnostic Design and Integration

التفاصيل البيبلوغرافية
العنوان: Progress in ITER ECE Diagnostic Design and Integration
المؤلفون: S. Danani, William L. Rowan, Ph. Maquet, S. Jha, Victor Udintsev, S. Thomas, M. Schneider, Ravi Kumar, P. E. Phillips, J. Guirao, Amanda Hubbard, C. Nazare, N. Gimbert, T. Giacomin, S. Hughes, Allan Basile, L. Worth, Michael Walsh, H. Neilson, Russell Feder, Andrei Khodak, Vinay Kumar, A. K. Saxena, Max E Austin, S. Pak, G. Taylor, S. B. Padasalagi, George Vayakis, Siddharth Kumar, H.K.B. Pandya
المصدر: EPJ Web of Conferences, Vol 203, p 03003 (2019)
بيانات النشر: EDP Sciences, 2019.
سنة النشر: 2019
مصطلحات موضوعية: Electric power transmission, law, Physics, QC1-999, Cyclotron, Calibration, Electronic engineering, Terahertz detector, Structural integrity, Port (circuit theory), Instrumentation (computer programming), Power (physics), law.invention
الوصف: The ITER Electron Cyclotron Emission (ECE) diagnostic is progressing towards its Preliminary Design Review (PDR). In parallel, the diagnostic integration in the Equatorial Port is ongoing. Port Integration has to address the structural integrity to withstand various loads, maintenance and the safety aspects of ECE diagnostic. The ITER ECE system includes radial and oblique lines-of-sight. Recently, a successful peer-review of the in-port plug Hot Calibration Source has taken place and its performance and integration feasibility has been demonstrated. Four 45-meter long low-loss transmission lines are designed to transmit mm-wave power in the frequency range of 70- 1000 GHz in both X- and O-mode polarization from the port plug to the ECE instrumentation room in the diagnostic building. Prototype transmission lines are being tested [1]. A prototype polarizing Martin-Puplett type Fourier Transform Spectrometer (FTS) operating in the frequency range 70-1000 GHz, has a fast scanning mechanism and a cryo-cooled dual-channel THz detector system. Its performance has been tested as per ITER requirements. Assessment of the instrumentation and control requirements, functional and non-functional requirements, operation procedures, plant automation are ongoing for the PDR. The current status of the diagnostic, together with integration activities, is presented.
اللغة: English
URL الوصول: https://explore.openaire.eu/search/publication?articleId=doi_dedup___::40f9a428b8971f712dec6b52e2265830
https://www.epj-conferences.org/articles/epjconf/pdf/2019/08/epjconf_ec2018_03003.pdf
حقوق: OPEN
رقم الأكسشن: edsair.doi.dedup.....40f9a428b8971f712dec6b52e2265830
قاعدة البيانات: OpenAIRE