Status of the ESRF-Extremely Brilliant Source Project

التفاصيل البيبلوغرافية
العنوان: Status of the ESRF-Extremely Brilliant Source Project
المؤلفون: Revol, Jean-Luc, Benabderrahmane, Chamseddine, Berkvens, Paul, Biasci, Jean-Claude, Bouteille, Jean-François, Brochard, Thierry, Carmignani, Nicola, Chaize, Jean-Michel, Chavanne, Joel, Cianciosi, Filippo, D'Elia, Alessandro, Dimper, Rudolf, Dubrulle, Marc, Einfeld, Dieter, Ewald, Friederike, Eybert, Laurent, Gautier, Georges, Goirand, Loys, Hardy, Laurent, Jacob, Jörn, Joly, Benoit, Langlois, Michel, Le Bec, Gaël, Leconte, Isabelle, Liuzzo, Simone, Maccarrone, Cristian, Mairs, Trevor, Marchial, Thierry, Marques, Hugo, Martin, David, Mercier, Jean-Maurice, Meunier, Anthony, Morati, Mathieu, Pasquaud, J., Perron, Thomas, Plouviez, Eric, Rabeuf, Eric, Raimondi, Pantaleo, Renaud, Pascal, Roche, Benoit, Scheidt, Kees, Serrière, Vincent, Van Vaerenbergh, Pierre, Versteegen, Reine, White, Simon
المساهمون: European Synchrotron Radiation Facility (ESRF)
المصدر: 9th International Particle Accelerator Conference
9th International Particle Accelerator Conference, Apr 2018, Vancouver, Canada. pp.THXGBD3, ⟨10.18429/JACoW-IPAC2018-THXGBD3⟩
بيانات النشر: HAL CCSD, 2018.
سنة النشر: 2018
مصطلحات موضوعية: operation, injection, [PHYS.PHYS.PHYS-ACC-PH]Physics [physics]/Physics [physics]/Accelerator Physics [physics.acc-ph], vacuum, A05 Synchrotron Radiation Facilities, 02 Photon Sources and Electron Accelerators, SRF, 7. Clean energy, dipole, Accelerator Physics
الوصف: The ESRF - the European Synchrotron Radiation Facility - is a user facility in Grenoble, France, and the source of intense high-energy (6 GeV) X-rays. In 2019, the existing storage ring will be removed and a new lattice will be installed in its place, dramatically reducing the equilibrium horizontal emittance. This 'fourth-generation' synchrotron will produce an X-ray beam 100 times more brilliant and coherent than the ESRF source today. The Extremely Brilliant Source (EBS) project was launched in 2015 and is now well underway, on track for its scheduled completion in 2020. The design is completed, the procurement in full swing, the assembly has started, and critical installation activities are being prepared. The current status, three years into the project, will be revealed, along with the expected performance of the accelerator and the technical challenges involved. This paper will focus on the implementation of the project.
Proceedings of the 9th Int. Particle Accelerator Conf., IPAC2018, Vancouver, BC, Canada
اللغة: English
URL الوصول: https://explore.openaire.eu/search/publication?articleId=doi_dedup___::9479a0b3e8b3bada61c563d3791b8bf7
https://hal.archives-ouvertes.fr/hal-01902984
رقم الأكسشن: edsair.doi.dedup.....9479a0b3e8b3bada61c563d3791b8bf7
قاعدة البيانات: OpenAIRE