Further RF Measurements on the Superconducting 217 MHz CH Demonstrator Cavity for a CW Linac at GSI

التفاصيل البيبلوغرافية
العنوان: Further RF Measurements on the Superconducting 217 MHz CH Demonstrator Cavity for a CW Linac at GSI
المؤلفون: Dziuba, Florian, Aulenbacher, Kurt, Barth, Winfried, Basten, Markus, Burandt, Christoph, Busch, Marco, Conrad, Thorsten, Gettmann, Viktor, Heilmann, Manuel, Kürzeder, Thorsten, Lauber, Simon, List, Julian, Miski-Oglu, Maksym, Podlech, Holger, Salvatore, Julian, Schnase, Alexander, Schwarz, Malte, Yaramyshev, Stepan
المصدر: Journal of physics / Conference Series 1350(1), 012185 (2019). doi:10.1088/1742-6596/1350/1/012185
Geneva : JACoW Publishing, CERN 2826-2829 (2019). doi:10.18429/JACOW-IPAC2019-WEPRB014
Proceedings of the 10th International Particle Accelerator Conference
Proceedings of the 10th International Particle Accelerator ConferenceThe 10th International Particle Accelerator Conference, Melbourne, Australia, 2019-05-19-2019-05-24
بيانات النشر: GSI Helmholtzzentrum fuer Schwerionenforschung, GSI, Darmstadt, 2019.
سنة النشر: 2019
مصطلحات موضوعية: Superconductivity, History, MC7: Accelerator Technology, Materials science, business.industry, Phase (waves), Injector, Linear particle accelerator, Accelerator Physics, Computer Science Applications, Education, law.invention, Ion, Heavy ion beam, law, Optoelectronics, Continuous wave, ddc:530, business, Beam (structure)
الوصف: Proceedings of the 10th International Particle Accelerator Conference The 10th International Particle Accelerator Conference, Melbourne, Australia, 19 May 2019 - 24 May 2019; Geneva : JACoW Publishing, CERN 2826-2829 (2019). doi:10.18429/JACOW-IPAC2019-WEPRB014
Recently, the first section of the superconducting (sc) continuous wave (cw) Linac has been extensively tested with heavy ion beam from the GSI High Charge State Injector (HLI). During this testing phase, the reliable operability of 217 MHz multi gap crossbar-H-mode (CH) cavities has been successfully demonstrated. The sc 217 MHz CH cavity (CH⁰) of the demonstrator setup accelerated heavy ions up to the design beam energy and even beyond at high beam intensities and full transmission. This worldwide first beam test with a sc CH cavity is a major milestone on the way realizing the entire sc cw Linac project. In this contribution further RF measurements on the cavity are presented providing full characterization of the RF structure.
Published by JACoW Publishing, CERN, Geneva
اللغة: English
DOI: 10.15120/gsi-2019-01098
URL الوصول: https://explore.openaire.eu/search/publication?articleId=doi_dedup___::b865621fafd70ed1bbac143c501617cb
حقوق: OPEN
رقم الأكسشن: edsair.doi.dedup.....b865621fafd70ed1bbac143c501617cb
قاعدة البيانات: OpenAIRE