Geodetska dela pri rekonstrukciji regionalne ceste Moravče-Tihaboj-Mirna

التفاصيل البيبلوغرافية
العنوان: Geodetska dela pri rekonstrukciji regionalne ceste Moravče-Tihaboj-Mirna
المؤلفون: Berus, Simona
المساهمون: Koler, Božo
بيانات النشر: S. Berus, 2016.
سنة النشر: 2016
مصطلحات موضوعية: setting out buildings, geodetski načrt, reconstruction of road, design, geodetic plan, udc:528:625.7/.8(043.2), zakoličevanje objektov, projektiranje, prečni in vzdolžni profili, rekonstrukcija ceste, cross and longitudinal sections
الوصف: V diplomski nalogi so predstavljena geodetska dela pri rekonstrukciji regionalne ceste R2-417/4326 Moravče–Tihaboj- Mirna. V prvem delu diplomske naloge sem v nekaj stavkih opisala, kaj vse je potrebno upoštevati pri projektiranju ceste, ter na kratko opisala projektno in tehnično dokumentacijo, ki je namenjena za gradnjo, uporabo in vzdrževanje cest. V nadaljevanju sem bolj podrobno opisala geodetska dela pred, med in po rekonstrukciji ceste pri katerih sem tudi sama sodelovala. Ta se pričnejo z razvijanjem geodetskih mrež, pridobivanjem in izdelavo geodetskih podlag za projektiranje, geodetskimi deli povezanimi s pridobivanjem gradbene parcele ter izdelavo elaborata za zakoličenje detajlnih točk objekta. V nadaljevanju sledi zakoličenje karakterističnih točk objekta in zakoličenje gospodarske javne infrastrukture, kontrolne meritve ter detajlna izmera gospodarske javne infrastrukture. Po koncu gradnje pa sledi izdelava geodetskega načrta za potrebe projekta izvedenih del, vpis v uradne evidence in kontrola geometrije objekta med njegovo uporabo. The thesis presents the geodetic works involved in the reconstruction of regional road R2-417/4326 Moravče–Tihaboj–Mirna. The first part lists the factors to consider when designing a road and briefly describes the technical and project documentation required for road construction, use, and maintenance. This is followed by a more in-depth description of geodetic works before, during, and after road reconstruction, in which I was involved myself. The process starts with the development of geodetic networks, obtaining and preparing geodetic bases for design, geodetic works related to obtaining a building plot, and preparing a study for setting out the detailed points of the building. This is followed by the setting out of the characteristic points of the building and the setting out of public infrastructure, control measurements, and a detailed measurement of public infrastructure. After the end of construction, a land surveying plan is prepared for the as-built design, the building is entered in official records, and the building geometry during use is verified.
وصف الملف: application/pdf
اللغة: Slovenian
URL الوصول: https://explore.openaire.eu/search/publication?articleId=od______3505::72691022c3944da0b8895b107cfc729a
https://hdl.handle.net/20.500.12556/RUL-83171
حقوق: OPEN
رقم الأكسشن: edsair.od......3505..72691022c3944da0b8895b107cfc729a
قاعدة البيانات: OpenAIRE