Floor Heave Control in Gob-Side Entry Retaining by Pillarless Coal Mining with Anti-Shear Pile Technology

التفاصيل البيبلوغرافية
العنوان: Floor Heave Control in Gob-Side Entry Retaining by Pillarless Coal Mining with Anti-Shear Pile Technology
المؤلفون: Ivan Sakhno, Svitlana Sakhno, Krzysztof Skrzypkowski, Oleksandr Isaienkov, Krzysztof Zagórski, Anna Zagórska
المصدر: Applied Sciences, Vol 14, Iss 12, p 4992 (2024)
بيانات النشر: MDPI AG, 2024.
سنة النشر: 2024
المجموعة: LCC:Technology
LCC:Engineering (General). Civil engineering (General)
LCC:Biology (General)
LCC:Physics
LCC:Chemistry
مصطلحات موضوعية: gob-side entry retaining, pillarless mining, floor heave control, mine roadway stability, thin coal seam mining, steel pile, Technology, Engineering (General). Civil engineering (General), TA1-2040, Biology (General), QH301-705.5, Physics, QC1-999, Chemistry, QD1-999
الوصف: The severe floor heave in gob-side entry retaining is the major restriction factor of the wide application of pillarless mining thin coal seams. Reinforcement and stress-relief floor heave control methods are the most promising. However, in practice, floor restoration is widely used. Therefore, floor heave control technology in gob-side entry retaining needs to be improved. This study proposes anti-shear pile technology to control floor heave in gob-side entry retaining. The research was mainly carried out by numerical simulation. It was found that the transformation of high vertical stresses in the entry floor underneath the filling wall and coal seam body into horizontal stresses starts the floor heave process. The vertical dilatancy of rocks under the roadway span and their subsequent unloading lead to the delamination of the floor strata and uplift of the entry contour. In this paper, the best pile installation scheme was found. It is a 2pile 5+2 scheme with the installation of two piles, each 2 m long. After that, it was shown that filling piles are more than 3.3 times cheaper than comparable analogs, and pile installation is less labor-intensive. The implementation of the proposed floor heave control method leads to a reduction in heaving by 2.47 times.
نوع الوثيقة: article
وصف الملف: electronic resource
اللغة: English
تدمد: 2076-3417
Relation: https://www.mdpi.com/2076-3417/14/12/4992; https://doaj.org/toc/2076-3417
DOI: 10.3390/app14124992
URL الوصول: https://doaj.org/article/0d22c212be6348e79694541a48e7a5fa
رقم الأكسشن: edsdoj.0d22c212be6348e79694541a48e7a5fa
قاعدة البيانات: Directory of Open Access Journals
الوصف
تدمد:20763417
DOI:10.3390/app14124992