دورية أكاديمية

Two Due-Date Assignment Scheduling with Location-Dependent Weights and a Deteriorating Maintenance Activity

التفاصيل البيبلوغرافية
العنوان: Two Due-Date Assignment Scheduling with Location-Dependent Weights and a Deteriorating Maintenance Activity
المؤلفون: Wei Wu, Dan-Yang Lv, Ji-Bo Wang
المصدر: Systems, Vol 11, Iss 3, p 150 (2023)
بيانات النشر: MDPI AG, 2023.
سنة النشر: 2023
المجموعة: LCC:Systems engineering
LCC:Technology (General)
مصطلحات موضوعية: scheduling, maintenance activity, common due date, common flow-allowance, slack due date, location-dependent weights, Systems engineering, TA168, Technology (General), T1-995
الوصف: This paper investigates single-machine scheduling with a deteriorating maintenance activity, where the processing time of a job depends on whether it is handled before or after the maintenance activity. Under common and slack due date assignments, the aim is to find the optimal job schedule, position of the maintenance activity, and optimal value of the common due date (flow-allowance) so that the linear weighted sum of earliness, tardiness and common due date (flow-allowance) value is minimized, where the weights are location-dependent (position-dependent) weights. Through a series of optimal properties, a polynomial time algorithm is proposed and it is then proven that the problem is polynomially solvable.
نوع الوثيقة: article
وصف الملف: electronic resource
اللغة: English
تدمد: 2079-8954
Relation: https://www.mdpi.com/2079-8954/11/3/150; https://doaj.org/toc/2079-8954
DOI: 10.3390/systems11030150
URL الوصول: https://doaj.org/article/dee109201d0041c19092bb213844de7d
رقم الأكسشن: edsdoj.109201d0041c19092bb213844de7d
قاعدة البيانات: Directory of Open Access Journals
الوصف
تدمد:20798954
DOI:10.3390/systems11030150