Development of MS Excel and Power BI Integrated Production Scheduling System for an MSME

التفاصيل البيبلوغرافية
العنوان: Development of MS Excel and Power BI Integrated Production Scheduling System for an MSME
المؤلفون: Pranav Shivraj Patil, Srishti Sudhir Patil, Sudhir Madhav Patil, Maneetkumar R. Dhanvijay
المصدر: Engineering Access, Vol 10, Iss 2, Pp 124-142 (2024)
بيانات النشر: Faculty of Engineering, Mahasarakham University, Kham Riang Subdistrict, Kantharawichai District, Maha Sarakham Province, Postal Code 44150, Thailand., 2024.
سنة النشر: 2024
المجموعة: LCC:Technology
مصطلحات موضوعية: enterprise resource planning (erp), micro, small and medium enterprises (msme), microsoft excel (ms excel), power bi, production planning (pp), production scheduling, Technology
الوصف: Industry 4.0, or I4.0, uses digitalization, blockchain technology (BCT), artificial intelligence (AI), and machine learning (ML) to improve supply chain responsiveness and efficiency while cutting costs. Production planning (PP) is emphasized in manufacturing, a critical stage of supply chain management (SCM). In order to meet changing customer demands and optimize manufacturing processes, researchers concentrate on creating customized PP modules for use within enterprise resource planning (ERP) systems. ERP modules support predictive analytics for ideal inventory levels, resource needs, and supply chain risks in addition to managing operations. However, it is financially difficult for micro, small, and medium enterprises (MSMEs) to implement a comprehensive ERP system. Implementing ERP in MSMEs for production scheduling is challenging due to time, information technology (IT) expertise, and cost constraints, especially for make-to-order (MTO) MSMEs. Microsoft Excel (MS Excel) and Power BI offer a better alternative with easier learning, customization, quicker implementation, and lower cost. This solution integrates both for efficient production scheduling and resource planning. A concurrent, adaptable PP system that integrates MS Excel and Power BI is suggested as a solution to this problem. Machine schedules and important performance indicators are projected onto an operational dashboard by this system, which is intended for a parallel machine environment. The objective is to find the best combination of shifts (s = 1 to 3) and machines (m = 1 to 6) for a workload through 18 simulations, helping planners to meet delivery deadlines. The PP system's ideal combination changes over the course of six weeks of simulations, from 1s-1m to 3s-5m to 2s-3m, demonstrating its flexibility in response to shifting production demands. Despite fluctuating workload over six weeks, (i) 92% orders met the 45-day lead time, (ii) plant ran continuously for a month (100% achievement), and (iii) visibility for stakeholder was enhanced with efficient resource planning and providing scope for further detailed analysis towards improving important performance indicators.
نوع الوثيقة: article
وصف الملف: electronic resource
اللغة: English
تدمد: 2730-4175
Relation: https://ph02.tci-thaijo.org/index.php/mijet/article/view/252664; https://doaj.org/toc/2730-4175
DOI: 10.14456/mijet.2024.15
URL الوصول: https://doaj.org/article/319a1d21b32e4c3fb729b70ad7b65ebb
رقم الأكسشن: edsdoj.319a1d21b32e4c3fb729b70ad7b65ebb
قاعدة البيانات: Directory of Open Access Journals
الوصف
تدمد:27304175
DOI:10.14456/mijet.2024.15