دورية أكاديمية

Coordination of aluminium crusher and battery energy storage system to provide multistage power system services

التفاصيل البيبلوغرافية
العنوان: Coordination of aluminium crusher and battery energy storage system to provide multistage power system services
المؤلفون: Osaka Rubasinghe, Tingze Zhang, Xinan Zhang, Tat Kei Chau, Yau Chow, Tyrone Fernando, Herbert Ho‐Ching Iu
المصدر: IET Generation, Transmission & Distribution, Vol 18, Iss 8, Pp 1698-1713 (2024)
بيانات النشر: Wiley, 2024.
سنة النشر: 2024
المجموعة: LCC:Production of electric energy or power. Powerplants. Central stations
مصطلحات موضوعية: battery management systems, demand side management, energy storage, frequency control, frequency response, manufacturing industries, Distribution or transmission of electric power, TK3001-3521, Production of electric energy or power. Powerplants. Central stations, TK1001-1841
الوصف: Abstract Ancillary service provision and peak shaving (PS) play essential roles in the current day‐to‐day power system operation, which is challenged by the increasing renewable generation penetration. Providing these critical services using classical approaches such as peak load generators has been limited due to high operational costs and environmental impacts. The use of battery energy storage systems (BESS) is another popular method that is limited by high initial investment costs and high degradation rates. In this work, a novel approach to utilize industrial loads and BESS to provide multiple power system services in different stages is proposed. Industrial loads such as aluminium crushers are known for their intensive electricity consumption. Nevertheless, when applied in frequency regulation (FR), they perform poorly due to their discrete nature in operation. This drawback and the aforementioned BESS shortcomings are addressed by combining on‐site BESS with plant machinery to provide FR services and recover BESS related costs. Later, depending on the optimal capacity distribution, BESS usage is extended into the energy arbitrage market to provide PS services. This approach resulted in higher earnings for participating customers and network operators, as well as in less CO2 emissions, and minimal BESS degradations. An Australian case study of the South West Interconnected System, along with Worsley Alumina refinery data of Western Australia has been used to showcase the model performances.
نوع الوثيقة: article
وصف الملف: electronic resource
اللغة: English
تدمد: 1751-8695
1751-8687
Relation: https://doaj.org/toc/1751-8687; https://doaj.org/toc/1751-8695
DOI: 10.1049/gtd2.13153
URL الوصول: https://doaj.org/article/49bf6936a3ba4a418e0c00301f7c3230
رقم الأكسشن: edsdoj.49bf6936a3ba4a418e0c00301f7c3230
قاعدة البيانات: Directory of Open Access Journals
الوصف
تدمد:17518695
17518687
DOI:10.1049/gtd2.13153