Tradeoff different construction project goals in using a novel multi-objective sea horse algorithm

التفاصيل البيبلوغرافية
العنوان: Tradeoff different construction project goals in using a novel multi-objective sea horse algorithm
المؤلفون: Duc Anh Nguyen, Ngoc-Thoan Nguyen, Quangdung Tran, Duc-Hoc Tran
المصدر: Alexandria Engineering Journal, Vol 82, Iss , Pp 55-68 (2023)
بيانات النشر: Elsevier, 2023.
سنة النشر: 2023
المجموعة: LCC:Engineering (General). Civil engineering (General)
مصطلحات موضوعية: Multi-objective optimization, SEA horse algorithm, Multi-criteria decision, Project goals tradeoff, Generalized construction projects, Construction management, Engineering (General). Civil engineering (General), TA1-2040
الوصف: Construction project managers aspire to achieve projects of the highest quality while minimizing time and cost. Presently, most trade-off analysis models focus predominantly on the traditional trifecta of time, cost, and quality, often overlooking other pivotal factors and project traits. This study introduces the Chaotic Adaptive Multi-Objective Sea Horse (CAMOSH), an innovative algorithm crafted to navigate the nuanced tradeoffs among time, cost, quality, risk, and environment (TCQRE) in comprehensive construction projects. CAMOSH leverages chaos sequences for population initialization and integrates an adaptive selection technique to harmonize exploitation and exploration during optimization. To facilitate the early-stage project implementation, the multiple-criteria decision analysis (MCDA) method is employed. When benchmarked against six esteemed algorithms across two construction projects, CAMOSH shows its superiority. Statistical evaluation underscores CAMOSH’s outstanding performance, evidenced by its top-ranking values in Diversity Measure (DM) and Hyper-Volume (HV) for both case studies. Furthermore, the algorithm consistently yields solutions with the most optimal Spacing Metric (SM) values and operates in the shortest time frames. These results collectively validate CAMOSH as an instrumental resource, equipping project managers to adeptly balance multifaceted construction project objectives and pinpoint the most effective project timeline.
نوع الوثيقة: article
وصف الملف: electronic resource
اللغة: English
تدمد: 1110-0168
Relation: http://www.sciencedirect.com/science/article/pii/S1110016823008542; https://doaj.org/toc/1110-0168
DOI: 10.1016/j.aej.2023.09.059
URL الوصول: https://doaj.org/article/51851ffca3804a4b94ad5828c512f617
رقم الأكسشن: edsdoj.51851ffca3804a4b94ad5828c512f617
قاعدة البيانات: Directory of Open Access Journals
الوصف
تدمد:11100168
DOI:10.1016/j.aej.2023.09.059