دورية أكاديمية

The Optimization of Water Storage Timing in Upper Yangtze Reservoirs Affected by Water Transfer Projects

التفاصيل البيبلوغرافية
العنوان: The Optimization of Water Storage Timing in Upper Yangtze Reservoirs Affected by Water Transfer Projects
المؤلفون: Fan Wen, Wenhai Guan, Mingxiang Yang, Jixue Cao, Yibo Zou, Xuan Liu, Hejia Wang, Ningpeng Dong
المصدر: Water, Vol 15, Iss 19, p 3393 (2023)
بيانات النشر: MDPI AG, 2023.
سنة النشر: 2023
المجموعة: LCC:Hydraulic engineering
LCC:Water supply for domestic and industrial purposes
مصطلحات موضوعية: inter-basin water transfer projects, cascade reservoirs, reservoir water storage timing optimization, flood risk assessment, hydropower benefits, Hydraulic engineering, TC1-978, Water supply for domestic and industrial purposes, TD201-500
الوصف: To alleviate regional disparities in water resource distribution and consequent scarcity, China has initiated and planned a series of inter-basin water transfer projects using the Yangtze River Basin as the source. These projects are expected to divert approximately 33.4 billion cubic meters of water annually from the Yangtze River Basin. The implementation of these water transfer projects will inevitably alter the hydrological conditions in the upper reaches of the Yangtze River, impacting the reservoir storage strategies of cascading hydroelectric stations under current end-of-flood-season operational plans. This study quantitatively assesses the impact of water transfer projects on end-of-flood-season reservoir storage in cascading systems using the reservoir fullness ratio as an indicator. Employing reservoir storage analysis models, optimization techniques, and flood risk assessment methods, we simulated reservoir storage processes to evaluate associated flood risks and derive an optimized timing strategy for cascading reservoir storage. The results indicate that advancing the reservoir filling schedule by five days for both the Baihetan and Three Gorges dams can offset the adverse impacts of water transfer projects on reservoir storage efficiency. This adjustment restores the reservoir fullness ratio to levels observed in scenarios without water transfers while still meeting flood control requirements. After optimizing the timing of reservoir filling, the electricity generation capacity for the Baihetan and Three Gorges dams increased by 1.357 and 3.183 billion kWh, respectively, under non-transfer scenarios. In water transfer scenarios, the electricity generation for the Baihetan and Three Gorges dams increased by 1.48 and 2.759 billion kWh, respectively. By optimizing reservoir filling schedules, we not only improved the reservoir fullness ratio but also enhanced the electricity generation efficiency of the cascading systems, offering valuable insights for future reservoir operation optimization.
نوع الوثيقة: article
وصف الملف: electronic resource
اللغة: English
تدمد: 2073-4441
Relation: https://www.mdpi.com/2073-4441/15/19/3393; https://doaj.org/toc/2073-4441
DOI: 10.3390/w15193393
URL الوصول: https://doaj.org/article/7d3000db64204496b9472ad9fc0168b1
رقم الأكسشن: edsdoj.7d3000db64204496b9472ad9fc0168b1
قاعدة البيانات: Directory of Open Access Journals
الوصف
تدمد:20734441
DOI:10.3390/w15193393