دورية أكاديمية

A producer-retailer incorporated multi-item EPQ problem with delayed differentiation, the expedited rate for common parts, multi-delivery and scrap

التفاصيل البيبلوغرافية
العنوان: A producer-retailer incorporated multi-item EPQ problem with delayed differentiation, the expedited rate for common parts, multi-delivery and scrap
المؤلفون: Peter Chiu, Yuan-Shyi, Chiu, Tiffany, Pai, Fan-Yun, Wu, Hua Yao
المصدر: International Journal of Industrial Engineering Computations, Vol 12, Iss 4, Pp 427-440 (2021)
بيانات النشر: Growing Science, 2021.
سنة النشر: 2021
المجموعة: LCC:Industrial engineering. Management engineering
LCC:Production management. Operations management
مصطلحات موضوعية: Industrial engineering. Management engineering, T55.4-60.8, Production management. Operations management, TS155-194
الوصف: Transnational producers facing the present-day competitive global supply-chain environments need to pursue the most appropriate manufacturing scheme, quality screening task, and stock shipping plan to satisfy customer’s timely multi-item requirements under minimum overall product fabrication-delivery expenses. This study develops a producer-retailer incorporated multi-item two-stage economic production quantity- (EPQ-) based system with delayed differentiation, expedited-rate for common parts, multiple deliveries plan, and random scrap. It aims to assist current manufacturing firms in achieving the aforementioned operating goals. Mathematical methods help us build an analytical model to explicitly portray the studied problem’s features and derive its overall system expenses. Hessian matrix equations and optimization approaches help us prove convexity and derive the cost-minimized fabrication- delivery decision. This study gives a simulated example to illustrate the research outcome’s applicability and the proposed model’s capabilities numerically. Consequently, diverse crucial information becomes obtainable to the manufacturers to facilitate various operating decision makings as follows: (i) the cost-minimized fabrication-delivery policy; (ii) the behavior of system’s overall expenses and operating policy regarding mean scrap rate, and different relationships between common part’s values and completion-rate; (iii) the system’s detailed cost components; (iv) the system’s overall expenses, utilization, and common part’s uptime concerning different common part’s expedited rates; and (v) the collective effects of critical system features on the overall expenses, uptime, and optimal cycle length, etc.
نوع الوثيقة: article
وصف الملف: electronic resource
اللغة: English
تدمد: 1923-2926
1923-2934
Relation: http://www.growingscience.com/ijiec/Vol12/IJIEC_2021_11.pdf; https://doaj.org/toc/1923-2926; https://doaj.org/toc/1923-2934
DOI: 10.5267/j.ijiec.2021.5.001
URL الوصول: https://doaj.org/article/9ea4e039930244fa94169cc1f066f183
رقم الأكسشن: edsdoj.9ea4e039930244fa94169cc1f066f183
قاعدة البيانات: Directory of Open Access Journals
الوصف
تدمد:19232926
19232934
DOI:10.5267/j.ijiec.2021.5.001