دورية أكاديمية

Comparative analysis of managers’ perception in overseas construction project risks and cost overrun in actual cases: a perspective of the Republic of Korea

التفاصيل البيبلوغرافية
العنوان: Comparative analysis of managers’ perception in overseas construction project risks and cost overrun in actual cases: a perspective of the Republic of Korea
المؤلفون: Kyung-Tae Lee, Sang-Jun Park, Ju-Hyung Kim
المصدر: Journal of Asian Architecture and Building Engineering, Vol 22, Iss 4, Pp 2291-2308 (2023)
بيانات النشر: Taylor & Francis Group, 2023.
سنة النشر: 2023
المجموعة: LCC:Architecture
LCC:Building construction
مصطلحات موضوعية: risk perception, standardized coefficient, relative importance index, monte-carlo simulation, conflict risks, multivariable regression analysis, Architecture, NA1-9428, Building construction, TH1-9745
الوصف: As the number of overseas projects increase, capabilities of managers should be comprehended by handling risks. Therefore, comparison of project managers’ risk perception and risk handling costs from actual cases is necessary to set the management direction. Thus, eleven risk factors that occur frequently in overseas construction were classified into three categories . Perception of 54 international construction managers were collected by survey and ranked by using relative importance index. Consequently, managers perceived that the impact of risks occurring due to the wrong plan was high and conflict risk was low. Then, the data from 20 cases were amplified by applying Monte-Carlo simulation with statistical verification of reliability and normality . Through multivariable regression analysis, the cost impact of the legal conflict risks with the local subcontractors and engineers was the highest,intensely differed with managers’ perception. Specifically, the risks involving various stakeholders with sufficient time to resolve were not recognized, despite the high-cost impact. Though, fully understanding perception of the host-clients or site labors was difficult, this study is vital in that the conceptual gap was narrowed by numerically comparing the difference between risk perception of managers and actual risk cost. , It would be used as a guideline by focusing on factors with high impact for educating managers at overseas sites.
نوع الوثيقة: article
وصف الملف: electronic resource
اللغة: English
تدمد: 1347-2852
13467581
Relation: https://doaj.org/toc/1347-2852
DOI: 10.1080/13467581.2022.2116940
URL الوصول: https://doaj.org/article/fcda5a82618f40fdbb88e8fcca11aacf
رقم الأكسشن: edsdoj.fcda5a82618f40fdbb88e8fcca11aacf
قاعدة البيانات: Directory of Open Access Journals
الوصف
تدمد:13472852
13467581
DOI:10.1080/13467581.2022.2116940