Final cost benefit analysis for culvert replacement

التفاصيل البيبلوغرافية
العنوان: Final cost benefit analysis for culvert replacement
عناروين إضافية: Ohio Department of Transportation cost benefit analysis for culvert replacement
Cost benefit analysis for culvert replacement
مؤلف مشترك: Gresham, Smith, and Partners, author.
تفاصيل مُضافة: Nolan, Katie, author.
Ohio. Department of Transportation. Office of Statewide Planning & Research, issuing body.
Call Numbers: TE213 .G74 2016
Classification Codes: OTP 1.23/7:2016-12 ohdocs
وصف مادي: 4 online resources : color illustrations
Final report and Fact sheet are in PDF format; Appendices A and B are in Word format.
Supplemental Data: Description based on PDF and Word documents received as e-mail attachments; title from PDF title page of Final report (viewed on May 23, 2016).
مستخلص: ODOT's culvert database contains in excess of 83,000 culvert records, and ODOT needs to determine how best to use the culvert data to support cost-benefit decisions on appropriate replacement methods. Phase I (already completed) and Phase II (proposed) of this research will assist ODOT with implementing culvert replacement methods, and the cost-benefit analysis will be applied to the culvert database to assist with answering the following for ODOT: 1. What culverts in the database can be replaced by what method? 2. What was the process used to determine the replacement method? 3. What are the cost-benefits for each replacement methodology?
الموضوعات: Culverts Databases. Ohio, Culverts Design and construction Cost effectiveness. Ohio, Culverts Maintenance and repair Cost effectiveness. Ohio, Ponceaux Bases de données. Ohio, Ponceaux Entretien et réparations Coût-efficacité. Ohio, Culverts., Ohio.
مصطلحات الفهرس: 'culvert, rehabilitation, replacement, 'cost benefit analysis', 'pipe bursting', 'hydraulic jacked', bored, 'horizontal auger boring', Databases.
URL: https://ohiomemory.org/digital/collection/p267401ccp2/id/13748
ملاحظة: "Author(s), Katie Nolan, Tom Dietrich, Mark McCabe, Kathryn Gruver"--Technical report documentation page.
"April 2016"--Title page of Final report; "May 2016"--Cover of Final report.
[Final report] -- Appendix A: Fatal flaw results -- Appendix B: Preferred method criteria rankings -- [Fact sheet].
Sponsoring agency: Ohio Department of Transportation; State Job. No. 135302; ODOT Contract no. 27448; GS&P Project No. 41131.00
أرقام أخرى: OHI
950411126
المصدر المساهم: From OAIster®, provided by the OCLC Cooperative.
رقم الأكسشن: edsoai.ocn950411126
قاعدة البيانات: OAIster