مورد إلكتروني

Fastighetsförvaltningsbolags definition av BIM som objektbaserad informationsbärare : En fallstudie av BIM användning vid Nya Karolinska Solna

التفاصيل البيبلوغرافية
العنوان: Fastighetsförvaltningsbolags definition av BIM som objektbaserad informationsbärare : En fallstudie av BIM användning vid Nya Karolinska Solna
بيانات النشر: Mälardalens högskola, Akademin för ekonomi, samhälle och teknik 2020
تفاصيل مُضافة: Abdelmomen Samir Abdeljawad, Najmadin
نوع الوثيقة: Electronic Resource
مستخلص: The purpose of the study was to explore how property management companies view of Building Information Modeling (BIM) as a working method in property management process, and to explore the companies efforts at BIM in terms of the level of detail on BIM object implementation in property management. The study includes both companies that have and do not have contributions in BIM. The exploration was aimed at two companies and their varying ways of working to inform the needs of BIM in property management. The purpose of the study was also to give a clear picture of how BIM tools should be defined in the management process. The work was used of qualitative methods to answer the questions first consisted of a literature review, interviews and case study. The case study was about BIM implementation in New Karolinska Solna. The result showed that the definition of BIM in property management companies is not clear yet. The companies have intended to use BIM, but they are not there yet, there should be a type of requirements list that works with planning and production and benefit from using BIM in the property management. According to respondents, most of the common reasons why BIM was not used were because the approach of the tool. There is no proper structure or common working method of how the tool would be applied. Many literature sources including respondents claimed that BIM seemed good and have a good potential to be the future work process. BIM leads to improved work environment, improved sustainability development, good marketing, increased quality in work, time savings, and improved project management. As a suggestion as to how BIM could be implemented, it can be described in a few steps, which is status analysis, identify the benefits of BIM, start implementing on a smaller scale, follow up continuously, improve and expand the work and last but not least Integrate information. The conclusions that can be drawn from the results and literature study were that BIM
مصطلحات الفهرس: BIM, digital working methods, property management company, BIM in property management, New Karolinska Solna, BIM codes, BIM-level of detail, BIM-level of Development, new digitalization methods in the construction industry, digitala arbetsmetod, fastighetsförvaltningsbolag, BIM i fastighetsförvaltning, Nya Karolinska Solna, BIM-koder, BIM-detaljnivå, BIM-utvecklingsnivåer, nya digitaliseringsmetoder i byggbranschen, Infrastructure Engineering, Infrastrukturteknik, Student thesis, info:eu-repo/semantics/bachelorThesis, text
URL: http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-51070
الإتاحة: Open access content. Open access content
info:eu-repo/semantics/openAccess
ملاحظة: application/pdf
Swedish
أرقام أخرى: UPE oai:DiVA.org:mdh-51070
1235328504
المصدر المساهم: UPPSALA UNIV LIBR
From OAIster®, provided by the OCLC Cooperative.
رقم الأكسشن: edsoai.on1235328504
قاعدة البيانات: OAIster