دورية أكاديمية

An upper bound for the inter-exit time of two jobs in an m-machine flow shop

التفاصيل البيبلوغرافية
العنوان: An upper bound for the inter-exit time of two jobs in an m-machine flow shop
المؤلفون: Marcello Urgo, Massimo Manzini
المصدر: Springer, Annals of Operations Research. 338(1):379-405
سنة النشر: 2024
الوصف: This paper addresses the class of permutation flow shop scheduling where jobs, after their completion, must be grouped in batches. This is a common scheme in industrial environments, where products undergo multiple process steps in different shops and, when completed, must be transported to customers or the next production step. A new optimisation criterion is used, the inter-exit time, i.e., the difference between the completion times of two jobs. An upper bound is proposed and demonstrated for a general permutation flow shop with m machines.
نوع الوثيقة: redif-article
اللغة: English
DOI: 10.1007/s10479-024-05957
الإتاحة: https://ideas.repec.org/a/spr/annopr/v338y2024i1d10.1007_s10479-024-05957-y.html
رقم الأكسشن: edsrep.a.spr.annopr.v338y2024i1d10.1007.s10479.024.05957.y
قاعدة البيانات: RePEc
الوصف
DOI:10.1007/s10479-024-05957